2021 Mill and Overlay Project

The 2021 Mill and Overlay Project includes 2.8 miles of residential streets as shown on the Location Map below.  The Mill and Overlay process includes removing the upper 1 1/2 inches of pavement, patching the existing cracks in the remaining pavement, and then paving 1 1/2 inches of new pavement. Concrete pedestrian ramps and the adjacent curb and gutter will be removed and replaced to meet ADA compliance.  

Brochure 2021 Mill  Overlay 2

Want more info?

To contact a representative of the City of Cottage Grove, a hotline phone number and email are available for your use.
Project Hotline
Brochure 2021 Mill Overlay
2021 Mill and Overlay Map